Difference between revisions of "VTube-LASER v1.68"
Line 31: | Line 31: | ||
===[[image:Check.jpg|25px]] REVISED: Overbend Calculator=== | ===[[image:Check.jpg|25px]] REVISED: Overbend Calculator=== | ||
− | [[image:vtube- | + | [[image:vtube-laser_overbend.jpg|500px]] |
<table cellpadding=10> | <table cellpadding=10> | ||
<tr valign=top> | <tr valign=top> | ||
Line 42: | Line 42: | ||
</td> | </td> | ||
<td width=300> | <td width=300> | ||
− | |||
</td> | </td> | ||
</tr> | </tr> |
Revision as of 02:50, 9 August 2011
Revision 1.68Back to VTube-LASER |
NEW: Excel Report Builder
VTube-LASER can now build a Excel report quickly. This is useful for taking your reports even further for Gage R&R an custom reports.
|
REVISED: Overbend Calculator
The Overbend Calculator was redesigned and improved.
|
NEW: Automatic Combination of Bend Data
When split bend is used to create a straight in the middle of a bend, VTube-LASER automatically assumes that the split bends should be re-combined into one bend in all bend data charts.
|
NEW: Operator Chooses When to Connect the the FARO
Previous versions of VTube always assumed that operators meant to connect to a FARO arm. This causes the interface to pause repeatedly while it tries to reconnect to the arm that is not present.
|
NEW - Reset Coordinate Datum for MASTER or MEASURED to Zero
|
NEW - Add After Row in MASTER XYZ
|
Other Changes
|
|
|
|
|
|
|
|
|
Issues with this version fixed in newer versions
|
Other Pages
- Back to VTube-LASER
VTube-LASER Training Video - How to perform effective end scans. |