Difference between revisions of "VTube-Step v1.2"
From ATTWiki
Line 14: | Line 14: | ||
</tr> | </tr> | ||
− | < | + | </table> |
− | + | ||
− | + | <br><br> | |
− | < | + | |
− | < | + | |
− | [[image: | + | ===[[image:Check.jpg|25px]] ENHANCED - Math Improved for Complex Geometry=== |
− | + | ||
− | < | + | <table> |
<tr> | <tr> | ||
<td width=300> | <td width=300> | ||
− | + | More improvements have been made to complex geometry that allows for more precision at the high-detail level (in the 0.001" range)</td> | |
− | </td> | + | |
<td> | <td> | ||
+ | [[image:vtube-step_innergeometry_hole_cylinder.jpg|300px]] | ||
</td> | </td> | ||
</tr> | </tr> | ||
</table> | </table> | ||
− | |||
<br><br> | <br><br> |
Revision as of 16:11, 19 March 2010
ENHANCED - Projection Tolerance Precision Increased
The projection tolerance edit boxes were changed so that they always show 5 digits beyond the decimal - regardless of the linear unit decimal-place setup in the systems options. |
ENHANCED - Math Improved for Complex Geometry
More improvements have been made to complex geometry that allows for more precision at the high-detail level (in the 0.001" range) |
Other Pages
- Back to the VTube-STEP page
- The Network License Manager page describes the Network License Manager software