===New Inspection Grid Row Count Control===
 
===New Inspection Grid Row Count Control===
*VTube now controls the grid row count with the MASTER data row count.
+
*VTube now controls the grid row count with the MASTER data row count.  If the MASTER data as rows of points alone, then the inspection grid now also has rows to allow data entry for tolerances.
 
*This allows the grid to be populated even if the Measured data is cleared.
 
*This allows the grid to be populated even if the Measured data is cleared.
  

Revision as of 00:47, 8 December 2012

Vtube-laser logo.jpg

Revision 1.81

Vtube-laser 1.78.jpg




New Separate Report Template Setup for STEP and LASER

  • Previous versions had identical setups in both modes.
  • Some report templates are only appropriate in LASER because LASER handles inspections.
  • Now the setup of each is stored separately.



New Supravision Project Wall Thickness Import/Output

  • Previous versions did not save the wall thickness
  • This version imports and exports the wall thickness value.


New Supravision Project Qualification Tolerance Envelopes Import/Export

  • This version now imports and exports these values:
    • Default Qualification Envelope Tolerance
    • A End Length Qualification Tolerance
    • B End Length Qualification Tolerance
    • A End Angle Qualification Tolerance
    • B End Angle Qualification Tolerance


New Inspection Grid Row Count Control

  • VTube now controls the grid row count with the MASTER data row count. If the MASTER data as rows of points alone, then the inspection grid now also has rows to allow data entry for tolerances.
  • This allows the grid to be populated even if the Measured data is cleared.