Difference between revisions of "VTube-STEP v2.9.15"

From ATTWiki
Jump to: navigation, search
(Revision 2.9.15)
(Other Pages)
 
(3 intermediate revisions by one user not shown)
Line 23: Line 23:
 
__TOC__
 
__TOC__
  
==[[image:Check.jpg|25px]]NEW - ENTER FRACTION VALUES for FLOATING POINT in PART SETUP, XYZ GRIDS, and LRA GRIDS ==
+
==[[image:Check.jpg|25px]]FIX - IMPORTANT UPDATE for IMPORTING 180-DEGREE BENDS ==
  
 
<table cellpadding=10 width=1200>
 
<table cellpadding=10 width=1200>
Line 29: Line 29:
  
 
<td width=300>
 
<td width=300>
We discovered a customer that had to manually convert Imperial fractional units from a tube print.  So we taught VTube how to accept fraction values in the PART SETUP, XYZ GRIDS, and LRA GRIDS.<br><br>
+
If you import models with 180-degree bends, then you will use the Split Bend COLLECTION feature in VTube-STEP.<br><br>
The form VTube-LASER and VTube-STEP uses is identical to the AutoCAD standard for fraction entry.  If you know that standard, then you already know the VTube standard.<br><br>
+
Many customers still use inches in data entry. If you do, then try this after you install this new version:  Go to the Part Setup menu and type in the tube diameter using a fractional form.  Enter 3/16, 1/4, 3/8, 1/2, 5/8, 3/4, etc.  (That's the way we old-school designers and engineers still think.)
+
  
===Acceptable Fraction Forms===
+
We discovered a problem that could cause the centerline of the Split Bend construction to be short by 0.020 inches (0.5 mm).<br><br>
 +
If you use the Split Bend logic in VTube, then this update is critical for you because it addresses an issue we discovered during some research into Split Bend measuring issues with a customer.<br><br>
  
<table border=1 cellspacing=0 cellpadding=10>
+
</td>
<tr><td>"10-3/8"</td><td>converts to</td><td>10.375</td></tr>
+
<tr><td>"-10-3/8"</td><td>converts to</td><td>-10.375</td></tr>
+
<tr><td>"+10-3/8"</td><td>converts to</td><td>10.375</td></tr>
+
<tr><td>"3/8"</td><td>converts to</td><td>0.375</td></tr>
+
<tr><td>"-3/8"</td><td>converts to</td><td>-0.375</td></tr>
+
<tr><td>"3    /    8"</td><td>converts to</td><td>0.375</td></tr>
+
</table>
+
  
<br><br>
+
<td>
 
+
[[image:vtl_v2.9.15_splitbend_import.png|600px]]
===Rule Breaker Examples===
+
</td>
* 10 3/8 = Error (no dash between the 10 and the 3/8)<br><br>
+
* 10-3/0 = Error (division by zero)<br><br>
+
  
 +
</tr>
  
 +
</table>
 +
<br><br>
  
 +
==[[image:Check.jpg|25px]]NEW - SUPRAVISION BATCH IMPORT - NOW USES YOUR DEFAULT SETUP TO BUILD PROJECT FILES ==
  
 +
<table cellpadding=10 width=1200>
 +
<tr valign=top>
  
 +
<td width=300>
 +
The Supravision batch import can import any number of Supravision files at one time - building huge numbers of VTube project files in minutes.<br><br>
 +
We added the ability for this batch engine to automatically use your current project default when importing the data.
 
</td>
 
</td>
  
 
<td>
 
<td>
[[image:vtl_v2.9.14_fractions.png|400px]]
+
[[image:vts_v2.9.15_batch_sv_import.png|600px]]
 
</td>
 
</td>
  
Line 63: Line 62:
  
 
</table>
 
</table>
<br><br><br>
 
  
==[[image:Check.jpg|25px]] NEW - RONIKolli7 Bender Simulator ASCII XYZ File Import ==
+
<br><br>
 +
 
 +
==[[image:Check.jpg|25px]] NEW - VTUBE-STEP NOW IMPORTS AUTODESK INVENTOR TUBE XYZ FILES ==
  
 
<table cellpadding=10 width=1200>
 
<table cellpadding=10 width=1200>
Line 71: Line 71:
  
 
<td width=300>
 
<td width=300>
[[image:3slogo.png|150px]]<br><br>
+
Autodesk Inventor can create text files that contain the centerline XYZ data for a tube.<br><br>
VTube-STEP mode can now import RONIKolli7 bender simulator ASCII XYZ files.<br><br>
+
VTube-STEP can now import these files.
That data imported includes:
+
<br>
+
* Part Number (filename)
+
* Material Note
+
* Diameter
+
* Wall Thickness
+
* XYZ + centerline Radius
+
 
+
<br><br>
+
VTube also calculates the default radius and the Cut Length during the import.
+
 
</td>
 
</td>
  
 
<td>
 
<td>
[[image:vtl_2.9.14_ronikolli7_ascii_xyz.png|600px]]
+
[[image:vts_2.9.15_autodesk_inventor_import.png|600px]]
  
 
</td>
 
</td>
Line 95: Line 85:
  
 
<br><br>
 
<br><br>
 +
 +
==[[image:Check.jpg|25px]] OTHER CHANGES ==
 +
 +
<table cellpadding=10 width=900>
 +
<tr valign=top>
 +
 +
<td width=900>
 +
 +
*Fix - "Reset Point Labels" - The point labels no longer revert to the previous state if you save the project after a point label reset.
 +
 +
 +
 +
</td>
 +
 +
<td>
 +
</td>
 +
 +
</tr>
 +
 +
</table>
 +
<br><br>
 +
  
 
=Other Pages=
 
=Other Pages=

Latest revision as of 06:09, 9 October 2018

Vtube-step logo 2.png

Revision 2.9.15

Release Date: October 8, 2018
Build: 8


Vtube-step v2.9 mainscreen headerassembly purple.png



Contents


Check.jpgFIX - IMPORTANT UPDATE for IMPORTING 180-DEGREE BENDS

If you import models with 180-degree bends, then you will use the Split Bend COLLECTION feature in VTube-STEP.

We discovered a problem that could cause the centerline of the Split Bend construction to be short by 0.020 inches (0.5 mm).

If you use the Split Bend logic in VTube, then this update is critical for you because it addresses an issue we discovered during some research into Split Bend measuring issues with a customer.

Vtl v2.9.15 splitbend import.png



Check.jpgNEW - SUPRAVISION BATCH IMPORT - NOW USES YOUR DEFAULT SETUP TO BUILD PROJECT FILES

The Supravision batch import can import any number of Supravision files at one time - building huge numbers of VTube project files in minutes.

We added the ability for this batch engine to automatically use your current project default when importing the data.

Vts v2.9.15 batch sv import.png



Check.jpg NEW - VTUBE-STEP NOW IMPORTS AUTODESK INVENTOR TUBE XYZ FILES

Autodesk Inventor can create text files that contain the centerline XYZ data for a tube.

VTube-STEP can now import these files.

Vts 2.9.15 autodesk inventor import.png



Check.jpg OTHER CHANGES

  • Fix - "Reset Point Labels" - The point labels no longer revert to the previous state if you save the project after a point label reset.





Other Pages