Difference between revisions of "CNC Bender v12-20101116"
From ATTWiki
Line 34: | Line 34: | ||
<tr valign=top> | <tr valign=top> | ||
<td width=200> | <td width=200> | ||
− | To activate this delay, the processlist builder will insert a timer command into the secondary process that controls the absolute pre-rotate during the Feed axis moving away from the bending area.<br><br> | + | To activate this delay, the processlist builder will insert a timer command into the [[secondary process]] that controls the absolute pre-rotate during the Feed axis moving away from the bending area.<br><br> |
If the delay value is set to 0 in the Prebend option, then the timer is not inserted into this process. | If the delay value is set to 0 in the Prebend option, then the timer is not inserted into this process. | ||
</td> | </td> |
Latest revision as of 17:21, 16 November 2010
Contents |
NEW - Absolute Pre-Rotate Delay
The absolute pre-rotate command is highly optimized to rotate the spindle when the feed carriage is moving away from the part during the last bend. |
|
To activate this delay, the processlist builder will insert a timer command into the secondary process that controls the absolute pre-rotate during the Feed axis moving away from the bending area. |
Other Pages
- Back to CNC Bender
- Back to CNC Bender Software Updates
- See CNC Bender General Information
- See Teach Mode
- See Custom Commands