Difference between revisions of "VTube-LASER v1.91"

From ATTWiki
Jump to: navigation, search
(25px NEW: FARO Calibration Dialogs Show Either Inches or Millimeters)
(25px NEW: Leapfrog Feature)
Line 24: Line 24:
  
  
===[[image:Check.jpg|25px]] NEW: Leapfrog Feature===
+
===[[image:Check.jpg|25px]] NEW: Measuring Center Leapfrog Feature for Any Length Tube===
 
<table cellpadding=10>
 
<table cellpadding=10>
 
<tr valign=top>
 
<tr valign=top>
Line 35: Line 35:
 
</tr>
 
</tr>
 
</table>
 
</table>
 
 
 
  
 
===[[image:Check.jpg|25px]] NEW: FARO Calibration Dialogs Show Either Inches or Millimeters===
 
===[[image:Check.jpg|25px]] NEW: FARO Calibration Dialogs Show Either Inches or Millimeters===

Revision as of 00:39, 25 June 2014

Vtube-laser logo.jpg

Revision 1.91


Vtube-laser 1.89 mainscreen.png





Check.jpg NEW: Measuring Center Leapfrog Feature for Any Length Tube

The new Leapfrog feature allows you to measure any length of tube by measuring and leaping three or more magnetic cones. A leap can occur at any point during any tube measurement.

Vtube-laser-1.91-faro magnetic cones.png

Check.jpg NEW: FARO Calibration Dialogs Show Either Inches or Millimeters

Previous versions showed all linear distance values in Millimeters. Some users prefer to view them in Inches, so now the dialogs will show either unit depending on the current unit setting in VTube-LASER.

Vtube-laser-1.91-farodialogs changing units closeup.png

Vtube-laser-1.91-farodialogs changing units.png

Check.jpg NEW: Direct Communications with Eaton Leonard Premier, EL2000, and Ve-log Benders

  • Eaton Leonard Premier, EL2000, and Ve-log use an older current loop protocol that VTube can support with the appropriate electronics. (Benderlink Ethernet Module)

El premier 001.jpg



Check.jpg Enhanced: Project Batch Report Output

  • We added a second type of report per a customer spec.
  • The reports are now built to both comma delimted and tab delimited files.
  • The reports can be sent directly to Excel.

Vtube-1.90-project batch report output.png


Load the batch reporter in the Report menu of either STEP mode of LASER mode:

Vtube-1.90-project batch report button.png

This is a sample report file:

Vtube-1.90-project batch report file1.png

If the batch reporter finds files with 0 or negative length straights, then it will issue a WARNING at the end of the report log and create a second report file containing a list of all the project files with these lengths:

Vtube-1.90-project batch report file2.png

Check.jpg Other Changes

Other