Difference between revisions of "VTube-LASER Split Bend Feature"
(→STEP 4: Configure the Measure Setup) |
(→Split Bend LRA Compression) |
||
Line 77: | Line 77: | ||
</td> | </td> | ||
<td width=400 > | <td width=400 > | ||
− | [[image:split bend original data.png| | + | [[image:split bend original data.png|300px]]<br> |
</td> | </td> | ||
</tr> | </tr> |
Revision as of 17:28, 1 May 2017
|
About The Split Bend Feature
The Split Bend feature is VTube-LASER's unique method of measuring tubes with 180-degree bends or greater with accuracy.
|
Why Is Split Bend Necessary?
We invented Split Bend to solve a legacy measuring issue in the tube fabrication.
|
Configuring for Split Bend
Split Bend setup is controlled in the Bend Setup tab of the Master Tube menu in VTube-LASER, and in the Bend Setup tab in VTube-STEP. Both modes of VTube allow you to configure Split Bends. |
|
In the Split Bend window, set any straight that will be treated as a Split Bend. |
Split Bend LRA Compression
VTube-LASER knows that benders still like to refer to the 180-degree bends as a SINGLE bend. |
|
Continue with the Measure Setup in the Separation Filter menu
|
STEP 5: Measure The Part
This step is identical to regular reverse-engineering measuring. |
STEP 6: Choose Build Measured Tube Data Only
Because the MASTER data row count is greater than zero, the Measurement Complete window will offer to allow you to ALIGN the measured tube. |
|
The new measured tube will appear as a blue tube like this. |
STEP 7: Copy Measured to Master
Copy Measured to Master Data in the Data Handling menu. This will overwrite the MASTER data ZEROS with the MEASURED tube data. |
STEP 8: Optional Reset Origin to Zero
Some customers prefer to translate the new MASTER data so that the first point is at 0,0,0. |
STEP 9: View the New Master Tube
View the new MASTER tube by switching the display of the Master tube on, then redrawing and zooming all. |
STEP 10: Optional Alignment Test
This is a cross-check to be sure the process was performed properly. Enter the Inspection Results menu, and press Recalculate for the alignment. |
STEP 11: Save the VTube Project
Press the Project Save button in the Toolbar, choose the project save path and filename, and save the VTube Project file. |
Other Pages
- Back to VTube-LASER
- See also Calibration-Leapfrog-Move Targets
- Purchase the targets at the store.