Difference between revisions of "VTube STAR SVNet Bender Communications"
(→STEP 2: Setup the Benderlink Network Grid for HERBER MES Protocol) |
(→STEP 2: Setup the Benderlink Network Grid for STAR SVNet Protocol) |
||
Line 76: | Line 76: | ||
<tr valign=top> | <tr valign=top> | ||
<td width=500> | <td width=500> | ||
− | #Choose an unused row in the grid for a new | + | #Choose an unused row in the grid for a new STAR bender setup.<br><br> |
#Assign a bender name that will help operators identify which bender this is. This text will be displayed at the top of the Bender Setup menu.<br><br> | #Assign a bender name that will help operators identify which bender this is. This text will be displayed at the top of the Bender Setup menu.<br><br> | ||
− | #Assign the | + | #Assign the STAR SVNet protocol.<br><br> |
− | #Enter the path to the shared drive or folder in the NetPath field. This path should point to the | + | #Enter the path to the shared drive or folder in the NetPath field. This path should point to the network folder that will receive Supravision files from VTube. (The value shown on the screen is only an example.)<br><br> |
#Enter the IP address in the PING IP ADDRESS field if it is a fixed field. (This is not required. It allows VTube to ping the address to see if the network location is active before trying to open communications.)<br><br> | #Enter the IP address in the PING IP ADDRESS field if it is a fixed field. (This is not required. It allows VTube to ping the address to see if the network location is active before trying to open communications.)<br><br> | ||
− | #If the | + | #If the STAR bender rotates the check/collet Clockwise positive, then select YES in the CW Rotation Positive cell.<br><br> |
#Press Close to save the settings. VTube will save these values to a persistent configuration file that will not change unless you change them in this grid. | #Press Close to save the settings. VTube will save these values to a persistent configuration file that will not change unless you change them in this grid. | ||
Revision as of 14:56, 23 July 2018
This page describes the use of the VTube-STEP and VTube-LASER to STAR bender new data setup and corrections using the STAR SVNet protocol. |
Back to VTube-LASER
Network Protocol
VTube-STEP and VTube-LASER use a modified Supravision Network protocol to send new part data and bender part corrections to STAR EVO benders. |
STAR SVNet Data Protocol Information
These are important facts to know about this protocol.
|
BENDERLINK SETUP STEPS FOR VTUBE-LASER
STEP 1: Enter the SYSTEM OPTIONS Menu in VTube
|
STEP 2: Setup the Benderlink Network Grid for STAR SVNet Protocol
|
How to SEND CORRECTION Data to the HERBER Control from VTube-LASER
STEP 1 - Bend the Tube
Bend the tube in the HERBER bender. |
STEP 2 - Measure the tube with VTube-LASER
Measure and align the tube to determine if it qualifies by falling within the envelope tolerance for the tube shape. |
STEP 3 - Enter BENDER SETUP
Click on the BENDER SETUP button in the Navigation Pane. |
STEP 4 - Choose the BENDER NUMBER
Set the correct bender number at the top of the window. |
STEP 5 - COPY the Data from VTube-LASER's Main Memory
If this is the first correction, then the Bender Setup screen may show no data. If this is the case, then it is necessary to update the Bender Setup screen from VTube-LASER's main memory like this:
|
STEP 6 - OPTIONAL STEP - You Can Manually Change the ADJUSTMENT Values
You can manually change the ADJUSTMENT values before sending corrections if you want to. Some users like to set the first and last Length adjustment to zero in order to keep the start position of the carriage in the same place - for when they have extra length on the ends. |
STEP 7 - Send Corrections to the HERBER
Press "Auto SEND Bender CORRECTIONS". VTube-LASER will let you select a path, then save a MES file to that path. |
STEP 8 - The SEND to BENDER Complete Window
A window should appear for a few seconds indicating that the Send to the Bender is complete. |
STEP 9 - IMPORT the Correction Data at the HERBER Control
Move to the HERBER control and follow these steps:
|
|
|
|
|
STEP 10 - REPEAT STEPS 1 THROUGH 9
Bend the corrected tube starting in Step 1, then measure it again (Step 2) and follow the rest of the steps until the part is within tolerance. |
Other Pages
- See VTube-LASER
- See VTube-STEP
- See UNISON for information on UNISON benders