Difference between revisions of "VTube-LASER at FABTECH"
(→About the FABTECH Trade Show) |
(→HERBER MES Data Protocol Information) |
||
Line 40: | Line 40: | ||
</table> | </table> | ||
− | = | + | =UNISON LTD. REAL-TIME BENDER CORRECTIONS= |
− | + | ||
− | <table width= | + | <table width=1200> |
<tr valign=top> | <tr valign=top> | ||
<td width=500> | <td width=500> | ||
− | + | In the 2018 show, we were directly across from the UNISON LTD. booth - and were connected to their 25mm electric bender.</td> | |
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | </td> | + | |
<td width=300> | <td width=300> | ||
+ | [[image:unisonbooth_fabtech2018.png|800px | ||
</td> | </td> | ||
</tr> | </tr> |
Revision as of 04:05, 22 December 2018
Tradeshow: FABTECH
|
Back to VTube-LASER
About the FABTECH Trade Show
Every year we exhibit at FABTECH in the tube and pipe section of the show. The show alternates between cities:
|
UNISON LTD. REAL-TIME BENDER CORRECTIONS
In the 2018 show, we were directly across from the UNISON LTD. booth - and were connected to their 25mm electric bender. |
[[image:unisonbooth_fabtech2018.png|800px |
BENDERLINK SETUP STEPS FOR VTUBE-LASER
STEP 1: Enter the SYSTEM OPTIONS Menu in VTube
|
STEP 2: Setup the Benderlink Network Grid for HERBER MES Protocol
|
How to SEND CORRECTION Data to the HERBER Control from VTube-LASER
STEP 1 - Bend the Tube
Bend the tube in the HERBER bender. |
STEP 2 - Measure the tube with VTube-LASER
Measure and align the tube to determine if it qualifies by falling within the envelope tolerance for the tube shape. |
STEP 3 - Enter BENDER SETUP
Click on the BENDER SETUP button in the Navigation Pane. |
STEP 4 - Choose the BENDER NUMBER
Set the correct bender number at the top of the window. |
STEP 5 - COPY the Data from VTube-LASER's Main Memory
If this is the first correction, then the Bender Setup screen may show no data. If this is the case, then it is necessary to update the Bender Setup screen from VTube-LASER's main memory like this:
|
STEP 6 - OPTIONAL STEP - You Can Manually Change the ADJUSTMENT Values
You can manually change the ADJUSTMENT values before sending corrections if you want to. Some users like to set the first and last Length adjustment to zero in order to keep the start position of the carriage in the same place - for when they have extra length on the ends. |
STEP 7 - Send Corrections to the HERBER
Press "Auto SEND Bender CORRECTIONS". VTube-LASER will let you select a path, then save a MES file to that path. |
STEP 8 - The SEND to BENDER Complete Window
A window should appear for a few seconds indicating that the Send to the Bender is complete. |
STEP 9 - IMPORT the Correction Data at the HERBER Control
Move to the HERBER control and follow these steps:
|
|
|
|
|
STEP 10 - REPEAT STEPS 1 THROUGH 9
Bend the corrected tube starting in Step 1, then measure it again (Step 2) and follow the rest of the steps until the part is within tolerance. |
Other Pages
- See VTube-LASER
- See VTube-STEP
- See UNISON for information on UNISON benders