VTube-LASER v1.91

From ATTWiki
Revision as of 16:28, 9 May 2014 by Mcone (Talk | contribs)

Jump to: navigation, search

Vtube-laser logo.jpg

Revision 1.91


Vtube-laser 1.89 mainscreen.png





Check.jpg NEW: Feature

Check.jpg NEW: Communications with Eaton Leonard Premier, EL2000, and Ve-log Benders

  • Eaton Leonard Premier, EL2000, and Ve-log use an older current loop protocol that VTube can support with the appropriate electronics. (Benderlink Ethernet Module)



Check.jpg ENHANCED: QuickLoad Improved With Better Exploring

  • The QuickLoad window now allows for multiple filename extension types - like STEP and STP.

  • The QuickLoad window has a new tree menu on the left that includes the Desktop and Documents folders. This makes browsing more flexible than in the first QuickLoad menu.



Vtube-laser-1.90-quickload tree.png

Vtube-laser-1.90-quickload STEP.png

Check.jpg ENHANCED: Export/Import PERSISTENT Configurations With PROJECT DEFAULT SETUP Configurations

Vtube-laser-1.89-importexport configuration buttons.png

The export and import feature now automatically includes two configuration files - both the default project setup file and the persistent configuration file. The persistent setup represent values that will continue even if new project files are loaded.

With the persistent configuration included, the COMPLETE setup of VTube for any system can be easily saved and transferred to any other system.

Vtube-laser-1.89-importexport configuration.png



Check.jpg NEW: Project Batch Report Output

Some of our customers are building huge databases of VTube project files. In order to help manage the data, VTube can now output a comma-delimited batch report of the data in all project files in any folder.

Vtube-1.90-project batch report output.png


Load the batch reporter in the Report menu of either STEP mode of LASER mode:

Vtube-1.90-project batch report button.png

This is a sample report file:

Vtube-1.90-project batch report file1.png

If the batch reporter finds files with 0 or negative length straights, then it will issue a WARNING at the end of the report log and create a second report file containing a list of all the project files with these lengths:

Vtube-1.90-project batch report file2.png

Check.jpg Other Changes

Other