TubeCAD Pro v8-20071024
From ATTWiki
FIX for TubeCAD Long Chart ROTATION value placement
The ROTATIONS in the TubeCAD LONG chart were inserted one row too high. For example, the rotation between bends 1 and 2 may be -149.9 degrees. In this chart, that value is incorrectly place in between 2 and 3:
Bend 1 Radius +25.00 mm ( +25 mm) Tangent Distance +25.07 mm ( +25 mm) Arc Length +39.34 mm ( +39 1/4 mm) Arc Length Adjusted +39.34 mm ( +39 1/4 mm) Point 2 to Point 3 +72.63 mm ( +72 3/4 mm) Length Between Bends +22.62 mm ( +22 1/2 mm)
Rotation (+/- 180 Degrees) +0.0 deg ( SP)
Point 2 to Point 3 +72.63 mm ( +72 3/4 mm) Angle of Bend +89.9 deg ( Bend 2 Radius +25.00 mm ( +25 mm) Tangent Distance +24.95 mm ( +5 mm) Arc Length +39.22 mm ( +39 1/4 mm) Arc Length Adjusted +39.22 mm ( +39 1/4 mm) Point 3 to Point 4 +148.20 mm ( +148 1/4 mm) Length Between Bends +98.75 mm ( +98 3/4 mm)
Rotation (+/- 180 Degrees) -149.9 deg ( CW)
Point 3 to Point 4 +148.20 mm ( +148 1/4 mm) Angle of Bend +88.8 deg ( Bend 3 Radius +25.00 mm ( +25 mm) : : :
Here is the same chart with that same angle moved to the proper location:
Bend 1 Radius +25.00 mm ( +25 mm) Tangent Distance +25.07 mm ( +25 mm) Arc Length +39.34 mm ( +39 1/4 mm) Arc Length Adjusted +39.34 mm ( +39 1/4 mm) Point 2 to Point 3 +72.63 mm ( +72 3/4 mm) Length Between Bends +22.62 mm ( +22 1/2 mm)
Rotation (+/- 180 Degrees) -149.9 deg ( CW)
Point 2 to Point 3 +72.63 mm ( +72 3/4 mm) Angle of Bend +89.9 deg ( Bend 2 Radius +25.00 mm ( +25 mm) : : :