Difference between revisions of "How to Reverse Engineer with Split Bend"
(→STEP 6: Choose Build Measured Tube Data Only) |
(→STEP 6: Choose Build Measured Tube Data Only) |
||
Line 127: | Line 127: | ||
<td width=400 > | <td width=400 > | ||
FINISH and Build Measured Tube and press okay when the next popup screen appears. This is asking users to verify they want to make the tube they just measured the new MASTER tube going forward. <br><br> | FINISH and Build Measured Tube and press okay when the next popup screen appears. This is asking users to verify they want to make the tube they just measured the new MASTER tube going forward. <br><br> | ||
+ | |||
+ | </td> | ||
+ | <td width=400 > | ||
+ | [[image:vtube-laser-v4_FINISH and build.png|500px]]<br> | ||
+ | </td> | ||
+ | </tr> | ||
+ | </table> | ||
</td> | </td> | ||
<td width=400 > | <td width=400 > |
Revision as of 17:45, 16 December 2022
|
How to Reverse Engineer a Part Using Split Bend
The Split Bend feature allows you to accurately measure bends that equal or exceed 180 degrees. |
STEP 1: Enter PART SETUP Data
Enter the Part Setup data for the new part. Especially enter the PART NUMBER and DEFAULT RADIUS. (You can measure the radius if necessary in Measure Process.) |
STEP 2: Populate the MASTER TUBE DATA Grid
Since the Split Bend feature creates a grid based on the number of straights in the MASTER data, it is important to set the number of points that you will be measuring in the reversed tube. |
STEP 3: Configure the Split Bend Window
The Split Bend window is on the Bend Setup tab in the MASTER TUBE menu. Click into that window. |
|
In the Split Bend window, set any straight that will be treated as a Split Bend. |
STEP 4: Configure the Measure Setup
Configure Measure Setup like this:
|
|
Continue with the Measure Setup in the Separation Filter menu
|
STEP 5: Measure The Part
This step is identical to regular reverse-engineering measuring. |
STEP 6: Choose Build Measured Tube Data Only
FINISH and Build Measured Tube and press okay when the next popup screen appears. This is asking users to verify they want to make the tube they just measured the new MASTER tube going forward.
|
</td>
<td width=400 >
</td>
</tr>
<tr valign=top>
<td width=400 >
The new measured tube will appear as a blue tube like this.
</td>
<td width=400 >
</td>
</tr>
</table>
STEP 7: Copy Measured to Master
Copy Measured to Master Data in the Data Handling menu. This will overwrite the MASTER data ZEROS with the MEASURED tube data. |
STEP 8: Optional Reset Origin to Zero
Some customers prefer to translate the new MASTER data so that the first point is at 0,0,0. |
STEP 9: View the New Master Tube
View the new MASTER tube by switching the display of the Master tube on, then redrawing and zooming all. |
STEP 10: Optional Alignment Test
This is a cross-check to be sure the process was performed properly. Enter the Inspection Results menu, and press Recalculate for the alignment. |
STEP 11: Save the VTube Project
Press the Project Save button in the Toolbar, choose the project save path and filename, and save the VTube Project file. |
Other Pages
- Back to VTube-LASER
- See also Calibration-Leapfrog-Move Targets
- Purchase the targets at the store.